Racking Relocation

Racking Relocation UK โ€” Dismantle, Transport and Reinstall

Moving warehouse? Don't scrap your racking. Rackstor Installations Ltd provides full UK-wide racking relocation โ€” survey, dismantle, transport, inspect, reinstall and PUWER certify โ€” typically saving 40โ€“50% versus buying new. All works delivered by our own SEIRS registered engineers using our own plant and transport.

Free UK-wide survey ยท SEIRS registered ยท SEMA approved
ยฃ10M insured ยท Completion certificate on every install
๐Ÿ“ž 0800 654 6955

What racking relocation involves

A racking relocation is a single coordinated project covering survey of the existing system, safe dismantling, segregation and inspection of components, transport to the new site, layout design at the new building, reinstallation to SEMA standards and full PUWER sign-off. Done properly it preserves the investment in your existing pallet racking, cantilever, shelving or mezzanine and delivers a fully compliant system in the new location.

Why relocate rather than replace

  • Cost โ€” typically 40โ€“50% cheaper than buying new equivalent capacity.
  • Lead time โ€” relocation avoids 8โ€“12 week manufacturer lead times.
  • Sustainability โ€” reuses serviceable steel, reducing embodied carbon.
  • Familiarity โ€” your team already knows the system, pallet positions and pick faces.

Own plant and labour โ€” no subcontractors

Every Rackstor Installations relocation is delivered by directly employed engineers and our own MEWPs, forklifts, articulated transport and tooling. That means a single accountable team from dismantle to handover, no third-party scheduling clashes, and consistent SEIRS-registered quality on both sites.

SEMA compliant reinstallation and PUWER certificate

On dismantle, every upright, beam, baseplate and brace is visually inspected. Damaged components are quarantined and either replaced or refurbished before reinstall. The new layout is set out to SEMA Code of Practice, floor-fixed to manufacturer specification, fitted with load notices, and signed off with a PUWER certificate covering the entire installed system.

Our relocation process

  1. Survey both sites โ€” existing layout, condition, new building constraints.
  2. Design new layout โ€” CAD drawings, pallet count, MHE compatibility.
  3. Fixed price quotation โ€” dismantle, transport, reinstall, certificate.
  4. Programmed dismantle โ€” out-of-hours or phased to keep you trading.
  5. Inspection & transport โ€” quarantine damaged steel, palletise, deliver.
  6. Reinstall & certify โ€” SEMA-compliant build, load notices, PUWER sign-off.

Why choose Rackstor Installations for relocation

  • Save 40โ€“50% versus buying new
  • Own engineers, MEWPs and transport
  • SEIRS registered, SEMA compliant, PUWER certified
  • Component inspection and damage quarantine on dismantle
  • Out-of-hours, weekend and phased programmes
  • Nationwide UK coverage โ€” dismantle and reinstall in different cities

Specialist resource: rackrelocation.co.uk โ€” our dedicated relocation site

Frequently Asked Questions

How much can I save by relocating instead of buying new?

Most clients save 40โ€“50% versus the cost of new racking of equivalent capacity, even after dismantling, transport and reinstallation.

Do you use your own crews or subcontractors?

Our own. Every relocation is delivered by directly employed Rackstor Installations engineers and our own MEWPs, forklifts and transport.

Will the reinstalled racking be SEMA compliant?

Yes. We inspect every component on dismantle, quarantine any damaged uprights or beams, and reinstall to SEMA Code of Practice with a PUWER certificate on handover.

Can you work around our operation?

Yes โ€” out-of-hours, weekend, night-shift and phased relocations are part of our normal service to keep your warehouse trading.

Do you cover the whole UK?

Yes โ€” UK-wide, including same-team dismantle in one city and reinstall in another.

Ready to start? Free UK-wide survey.

Speak to a SEIRS registered engineer today.