UK Town
Penzance Pallet Racking & Shelving Installers
We install industrial storage across Penzance on both direct and subcontract terms. Typical jobs range from a stockroom of boltless shelving through to multi-aisle pallet racking and cantilever runs for long goods. Penzance sits within our South West England coverage, which our Somerset-based teams travel to on a planned schedule.
Local Coverage in Penzance
Across Penzance, the principal routes for planned installation work include A30 and A3071. Named commercial locations in our coverage include Long Rock Industrial Estate, Jelbert Way Commercial Zone and Penzance Harbour Freight Zone.
Businesses in the area work across fresh produce packaging, marine engineering and Scilly Isles ferry freight forwarding. Surrounding places covered include Hayle, St Ives, Helston, Marazion and Camborne.
What Penzance Customers Ask Us to Install
What to expect on site in Penzance
Components are checked against the delivery note when they arrive, laid out by bay and then assembled in sequence. Frames are plumbed, beams locked in and floor fixings set before decking goes in.
If the storage has been supplied by someone else, we are happy to work to their drawings and specification. We regularly act as the installation arm for storage suppliers who do not run their own crews.
Full Range Installed in Penzance
A sample of the categories our own crews install on Penzance area projects.
Why Penzance sites use Rackstor
- Cover of £10M for both public liability and professional indemnity.
- Somerset based, with installation teams travelling to Penzance regularly.
- Layouts set out to SEMA-aligned guidance and issued as CAD drawings before install.
- Surveys in Penzance cost nothing and quotes come back inside 24 hours.
- Full accreditation set: SEIRS, IPAF, CSCS and DBS clearance.
Mobile shelving, mesh partitioning and racking relocation are handled by our sister sites: mobile-shelving.uk, mesh-cages.uk and rackrelocation.co.uk.
Penzance installation enquiries
Give us the dimensions and load requirements and we will turn a quote around within 24 hours.